All case studies
Brightloop · Fintech · 6 weeks
A design system in six weeks, not six months
Two designers and three engineers rebuilt Brightloop's product UI ahead of a Series B.
- 6 wks
- from kickoff to v1
- 300+
- components documented
- 2.4×
- faster feature delivery

The challenge
Brightloop's app had grown screen by screen. Four squads used three button styles and nobody trusted the Figma file. Investors were due for a product demo in two months.
What we did
- 01Audited 140 screens and mapped every repeated pattern
- 02Built tokens and components in Figma and React side by side
- 03Paired with in-house engineers to migrate the highest-traffic flows first
- 04Wrote usage docs and ran two training sessions
The result
The demo shipped on the new system. Six months later the squads ship features 2.4× faster and design QA dropped from days to hours.
Vetta had a designer in our Slack within 48 hours. By week three it felt like Thabo had been here for years.